Projects

South Loop Elementary School – New Construction

The project involved building a new 130,000-square-foot, four-story elementary school to accomodate 1200 students as well as site upgrades at 1601 S. Dearborn Street. The school’s construction included 40 standard classrooms, two computer labs, three science labs, two art labs, one music room with a movable partition, warming kitchen and dining facilities, a gymnatorium, a library, a rooftop play area, an administrative center, and a student services suite. The school features a structural steel frame, cast-in-place lateral bracing, pile foundations, and an exterior cavity wall envelope made of cold-formed framing and face brick veneer were all included in the building’s construction. The site modifications included a new parking lot, upgrades to stormwater management, a playground, a waste/transformer enclosure, landscape planters, site furnishings, and improvements to the right-of-way.

pbc-south-loop-elementary-school-new-construction_0 pbc-south-loop-elementary-school-new-construction_1 pbc-south-loop-elementary-school-new-construction_2 pbc-south-loop-elementary-school-new-construction_3 pbc-south-loop-elementary-school-new-construction_4 pbc-south-loop-elementary-school-new-construction_5 pbc-south-loop-elementary-school-new-construction_6 pbc-south-loop-elementary-school-new-construction_7 pbc-south-loop-elementary-school-new-construction_8 pbc-south-loop-elementary-school-new-construction_9
Client Public Building Commission of Chicago
Prime / Subcontractor Subcontractor
Location Chicago, IL
Dollar value $4,714,841.00
Year 2020 - 2023

Discover more

O’Hare Terminal 5 Concourse M Extension, Core Expansion & Repurposing – Fire Alarm Replacement
Complete Fire Alarm Replacement at International Terminal 5, O'Hare Airport.
O’Hare and Midway Airports System Infrastructure Upgrades
Installation, repair, and replacement of diverse infrastructures such as electrical, lighting, traffic control, security, audio-video, and public address systems.
Standby Generator Replacement
Standby Generator Replacement
O'Hare Airport East Airfield Lightning Control Vault
East Vault to support the lighting loads, circuits, and equipment of Runways 9C/27C, Runway 9R/27L extension
Install New Locking Controls
Install New Locking Controls – Big Muddy Correctional Center
Digester Sludge Heater System Upgrades and Boiler Removal Calumet  
Replace six boilers, associated water pumps, power, and controls in Class 1 Division 1 environments.
Switchgear & Motor Control Center Replacement O’Brien Water Reclamation Plant
Remove and replace Motor Control Centers and Switchgear at The MWRD O’Brien Water Reclamation Plant.
ORD Emergency and Standby Power System Generators 1-6 O’Hare International Airport
Replacement of existing emergency and standby generators