Digester Sludge Heater System Upgrades and Boiler Removal Calumet  

BEI worked in close coordination with IHC to install underground feeders to ensure power was available to the new mechanical equipment.  a concrete encased ductbank of sixteen 4” fiberglass conduits were routed ¼ mile to the retrofitted electrical distribution building.  From there, twelve 3” fiberglass conduits were routed to each “cluster” of the anaerobic digester complex.

New motor control centers and distributed control system cabinets were located outside the harsh environment of the Class 1 Division 1 “Clusters”.  In the “Clusters” explosion proof pumps, actuators, starters, panelboards and more were installed to operate and control the new mechanical equipment.  As part of our Safety Guidelines BEI’s crew always wore Gas Monitoring Equipment while working.

digester-sludge-heater-system-upgrades-and-boiler-removal-calumet_0 digester-sludge-heater-system-upgrades-and-boiler-removal-calumet_1 digester-sludge-heater-system-upgrades-and-boiler-removal-calumet_2 digester-sludge-heater-system-upgrades-and-boiler-removal-calumet_3 digester-sludge-heater-system-upgrades-and-boiler-removal-calumet_4 digester-sludge-heater-system-upgrades-and-boiler-removal-calumet_5 digester-sludge-heater-system-upgrades-and-boiler-removal-calumet_6 digester-sludge-heater-system-upgrades-and-boiler-removal-calumet_7 digester-sludge-heater-system-upgrades-and-boiler-removal-calumet_8 digester-sludge-heater-system-upgrades-and-boiler-removal-calumet_9
Client Metropolitan Water Reclamation District of Greater Chicago (MWRD)
Prime / Subcontractor Subcontractor
Location Calumet
Dollar value $3,028,304.00
Year 2020 - 2023

Discover more

O’Hare Terminal 5 Concourse M Extension, Core Expansion & Repurposing – Fire Alarm Replacement
Complete Fire Alarm Replacement at International Terminal 5, O'Hare Airport.
O’Hare and Midway Airports System Infrastructure Upgrades
Installation, repair, and replacement of diverse infrastructures such as electrical, lighting, traffic control, security, audio-video, and public address systems.
Standby Generator Replacement
Standby Generator Replacement
O'Hare Airport East Airfield Lightning Control Vault
East Vault to support the lighting loads, circuits, and equipment of Runways 9C/27C, Runway 9R/27L extension
Install New Locking Controls
Install New Locking Controls – Big Muddy Correctional Center
Switchgear & Motor Control Center Replacement O’Brien Water Reclamation Plant
Remove and replace Motor Control Centers and Switchgear at The MWRD O’Brien Water Reclamation Plant.
ORD Emergency and Standby Power System Generators 1-6 O’Hare International Airport
Replacement of existing emergency and standby generators
South Loop Elementary School – New Construction
New Construction of a Chicago Public School.