Client:
Chicago Public Schools (CPS)
Project Name:
Stephen T. Mather High School
Chicago, IL
Start/Scheduled Date of Completion Date:
February 2012 - February 2013
Project Scope:

086_BEI_Photos_MatherThe bulk of this project, as subcontractor to Tyler Lane Construction, involved the installation of new electrical service, switchboards MCCs, emergency generator, ATSs, and power and lighting upgrades. Extensive room-by-room equipment upgrades required coordination to ensure the proper delivery of the various items to the proper locations. All work was performed while the building was occupied and in operation.

  • 40 television installations
  • VGA, Audio, and RCA terminations in 43 locations
  • 42 new projectors
  • Removal of existing concentrators in 16 locations
  • 4000-series wiremold with 90 degree connections in 27 locations
  • Old outlet removals from 19 locations
  • EMT Extensions (30' each of ¾” and 1”) in one location
  • Wiremold removal from 15 locations
  • Wiremold installation in 8 locations
  • VGA, Audio, and RCA extensions from the teacher stations to the projectors, in 42 locations
  • Removal of old TV (1 hour per location) from 19 locations
  • Add 30 feet of 4000 Wiremold at back of Classroom (Power, Voice/Data) from three locations
  • 16 other tasks in single locations
Project Dollar Value:
$5,996,418.00
Prime Contractor/Subcontractor:
Subcontractor