Clarence Buckingham Memorial Fountain- BEI Renovation Project 1995
Trackside power distribution equipment upgrades improved the wayside power system for the passenger rail cars that stop at this location. New equipment included two 15KV substations and two 480V MCCs. Associated work included the installation of new rail car power boxes, underground direct boring, trenching, and concrete work.