At the Egan Water Reclamation Plant itself, the project involved replacing the following:
One motor control center was also replaced at the nearby Hamilton Reservoir, requiring coordination with ComEd to procure a new outdoor CT compartment, watt hour meter, and grounding of the existing utility transformer. At the conclusion of the project, the team performed short circuit, protective device coordination, and arc flash hazard analysis studies for both locations.
The project-specific safety plan for this project included Confined Space Entry procedures. Project correspondence and documentation were handled using Autodesk Constructware software.